What CO2dok calculates
CO2dok calculates emissions from the construction process under the Danish building regulations (BR18 § 297-298, appendix 2): module A4 (transport to the site) and module A5 (the construction process: energy on site, material waste and construction waste). The starting point is the lines in the contractor's own quotes and invoices. The result is one report per project, which the main contractor or consultant can use in the overall assessment.
CO2dok is not a full life cycle assessment (LCA) of the building.
The core: BR18 factors on the actual figures from invoices
CO2dok applies BR18's own emission factors to the actual quantities on the invoices. These are the figures BR18 appendix 2, table 10 asks for: energy and transport are based on measured consumption.
| Invoice line | Typical sender | Quantity | Factor | Source |
|---|---|---|---|---|
| Diesel for machines on site (A5) | fuel card, fuel supplier | litres | 3.44 kg CO2e per litre | BR18 appendix 2, table 8.2 |
| Diesel for transport to site (A4) | fuel card | litres | 3.44 kg CO2e per litre | BR18 appendix 2, table 8.2 |
| Site electricity (A5) | electricity supplier | kWh | 0.07058 kg CO2e per kWh (2026) | BR18 appendix 2, table 8.1 |
| Gypsum waste, weighed (A5) | waste company | kg (or t) | 0.33 kg CO2e per kg | BR18 appendix 2, table 11 |
| Wood waste, weighed (A5) | waste company | kg (or t) | 0.14 kg CO2e per kg | BR18 appendix 2, table 11 |
| Mineral wool waste, weighed (A5) | waste company | kg (or t) | 0.69 kg CO2e per kg | BR18 appendix 2, table 11 |
| Iron and metal, weighed (A5) | waste company | kg (or t) | 1.97 kg CO2e per kg | BR18 appendix 2, table 11 |
When a product in the accounts is linked, CO2dok suggests the product, unit and conversion from the line's text and unit. For example, "Byggestrøm" (site electricity) in kWh becomes electricity, and "Gips til genanvendelse" in t becomes gypsum waste at 1 t = 1,000 kg. The user always confirms the suggestion.
Calculation method
- CO2 = quantity × factor (kg CO2e per unit). The quantity comes from the line. For lines from the accounts, the accounting unit is converted with the conversion factor the user has linked to the product (e.g. 1 board = 2.25 m²).
- Waste (tonnes) = quantity × waste share × weight per unit / 1000.
- Weighed waste (e.g. gypsum waste in kg from a weighing slip): CO2 = kg × BR18 appendix 2, table 11. The value covers producing the wasted material and treating the waste (A1-A3 and C3-C4), as BR18 prescribes for construction waste in A5.
- Fuel and electricity: litres or kWh × BR18 appendix 2, tables 8.2 and 8.1. This follows the BR18 principle that energy for transport and on site is based on consumption.
- Amount instead of quantity is used only where a spend-based factor with a source exists. None does today.
- Copy of the factor: every calculation stores a copy of the factor it used, with source and year. An old report therefore does not change when the factors are updated, and it can always be recalculated.
- Factors without a source are not guessed. They are marked "missing" and left out of the calculation. The line gets a note, and the report is clearly marked incomplete with a list of the missing factors.
Sources
- BR18 appendix 2, table 8.2: emission factors for fuels (diesel 3.44 kg CO2e per litre, September 2025).
- BR18 appendix 2, table 8.1: emission factors for electricity per year (2026: 0.07058 kg CO2e per kWh).
- BR18 appendix 2, table 10: principles for A4 and A5 (see next section).
- BR18 appendix 2, table 11: generic data for treating construction waste (per kg of waste).
- BR18 appendix 2, table 7: the Danish generic database (GenDK), used for weights (e.g. gypsum board 9.1 kg per m²).
All tables were read on bygningsreglementet.dk on 29 November 2026.
BR18 appendix 2, table 10: what it says and what CO2dok uses
Table 10 contains four things:
- The main rule: energy for transport (A4 and A5) and on site (A5) is based on measured consumption of fuel, electricity and district heating. Consumption shared between projects is split proportionally. Transport may also be calculated as km driven × consumption per km. Consumption is multiplied by tables 8.1 and 8.2. CO2dok follows the main rule (litres and kWh).
- Standard values for transport of materials to the site (A4), per kg of material. They may be used instead of measured consumption. Examples: gypsum boards 0.0166, structural timber 0.0074, wood boards 0.0491, mineral wool 0.0196, and steel sheets and profiles 0.0124 kg CO2e per kg. Anyone using them must also add 0.02 kg CO2e per m² of building per year for surplus materials and packaging. CO2dok does not use them yet (BACKLOG 20). They could become a clearly marked standard value for materials when the contractor has no fuel figures. They must not be combined with measured fuel for the same transport, which would count it twice.
- Terminal processes (temporary storage) in A4: 0.02 kg CO2e per m² of building per year.
- Transport of equipment and of waste: equipment to and from the site (A4) 0.02, removal of soil (A5) 0.06, and removal of construction waste (A5) 0.06 kg CO2e per m² of building per year.
The last two items are per m² of floor area for the whole building. CO2dok does not know the building's area, and the main contractor prepares the overall assessment. They are therefore not included.
Table 10 has no waste percentages and no factors per km or tonne-km. That is why waste estimated from delivered quantities, and transport per km or tkm, are marked "missing".
Scope
- Modules A4 and A5 only. Not A1-A3 for the materials built into the building, and not use (B), end of life (C) or module D.
- Only what is on the contractor's own documents, not the whole site.
- BR18 standard values per m² of floor area are not included, because CO2dok does not know the building's area. That covers terminal processes, transport of equipment, and removal of waste and soil.
- A4 from BR18 standard values per kg of material (table 10) is not supported yet. Combined with recorded fuel it would double count.
Limitations
- Only the contractor's own sales documents: CO2dok currently reads the quotes and invoices the contractor sends to the customer. Diesel, site electricity and waste are included when they are invoiced on to the customer. Reading purchase invoices (e.g. directly from the fuel card or the waste company) is planned (BACKLOG 9).
- Invoiced is not the same as used. Quantities from quotes and invoices are not measured consumption on site. Each report states which basis it uses.
- Waste share: there is no public standard for how much of a material ends up as waste. BR18 defines waste as the delivered quantity minus the quantity built in. Waste estimated from m² or m³ is therefore marked "missing". Use the weighed waste types instead.
- Transport per km or tonne-km: BR18 requires fuel consumption, so factors per km and tkm are marked "missing". Use "Diesel for transport" in litres.
- Electricity changes every year in table 8.1. The factor applies to 2026 and must be replaced at the turn of the year.
- Generic values: an EPD for the specific product may give a different figure.
- Biofuels (HVO, biodiesel) are not supported yet. Diesel is treated as fossil diesel.
- Mixed waste is marked "missing". BR18 requires the highest value among the types it contains, and the mix is unknown. Sort the waste.
- CO2dok does not replace an LCA consultant.